|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
"New database" Message Board Posts |
|
Thread 5 of 5 | ||||||
![]() Mike Prestwood | {Too Long!} Posted to MB Topic: Just Conversation « PrestwoodBoards Board 5/23/2007
|
3590 Hits | ||||
Thread 4 of 5 | ||||||
![]() Kyle | {Too Long!} Posted to MB Topic: Paradox Forms « Paradox Board 12/28/2006
|
2259 Hits | ||||
Thread 3 of 5 | ||||||
![]() Leo | Hi peeps., I have another interesting newbie question. Is there any way in object pal to present the user with a dialog box where he can choose the folder his database is in? The story behind this is that our software suddenly has to be able to open more than one identicaly structured database for particular users, like an auditor who may want to see the data from several different companies, each in its own database. We will provide him with functionality to open one database at a time. I've found the function "setAliasPath" that allows me to point the tables alias to a new directory containing an identically structured database like this:, setAliasPath("Tables","G:\\OtherDatabaseFolder"), Now i need to get a nifty way for the user to input where he put this new database. Any sugestions? In C++ I've used a standard windows open dialogue and I'm hoping something similar is avalable in Object pal. ThanksPosted to MB Topic: ObjectPAL « Paradox Board 12/28/2006
|
1638 Hits | ||||
Thread 2 of 5 | ||||||
![]() not2worry | I'm wondering if I need to use Referential Integrity (RI) on my new database. It contains about eight tables linked together in a form via the data model tool. It is on a network and has multiple users. There are several 1:M and 1:1 relationships set up on the data model., , The question is, if I don't allow users to access tables directly (using runtime) and they always use this form with the relationships all set up, is there some reason I should also setup RI?, , My main reason for not wanting to use RI is that I have heard thet it may more easily cause table corruption., , Thank you,, , Bruce Posted to MB Topic: Paradox Forms « Paradox Board 12/28/2006
|
1937 Hits | ||||
Thread 1 of 5 | ||||||
![]() reebok_tennis | Dear all,, , I have made a form for my new database. I added a bound object frame. Now I want to insert picture to my form. I know how to insert it by right clicking the frame and then select "Insert Object...." on the pop up menu. This procedure seems to be inelegant, because I want my user to insert the pic just by clicking a button. , , I want to make a button, name it "Insert Picture" button, and just by clicking the button, Access will open Dialog Window, and I can select the file I want to insert to my form. The problem is, I just don't know how to make the VBA code for this button. , , Can anyone help me how to make the VBA code for this problem? Please let me know. Thank you for you kind attention. , , Regards,, , Ary Posted to MB Topic: Access VBA Programming « Access Board 11/7/2007
|
5081 Hits | ||||
| More... |
"New database" Knowledge Base Posts |
|
| KB Article | |||
Mike Prestwood |
1. Generate Legacy Paradox PDFs
Create documentation directly from legacy Paradox system. We have a suite of PDoxDos and PDoxWin analysis tools which create our data models, data dictionaries, file inventories, and searchable reference databases. This documentation is used to create the new database as well as to extract many data driven business rules. This step includes setting up the legacy system with data in our development environment so developers can exercise the legacy system anytime needed throughout both steps of our 2-step process. Deliverable: Saved as PDFs on drive P as well as sent to the client in an email. Posted to KB Topic: Coding Services Info
5/28/2017
|
SS
2719
Hits |
Prestwood IT Solutions |
Mike Prestwood |
2. 1 of 2, AppName 1.0
Step 1 of 2: Discovery
Step 1 deliverables usually include a project plan for the Step 2 of 2 build-it phase which serves as the requirements, a new database, and a GUI mockup. Each form and report becomes a task in step 2 of our 2-step process along with other known tasks such as build data migration program, build MVC Shell Application, user subsystem, and admin forms for maintaining users, lookup tables, etc. Step 1 of our 2 step approach is used to start a project with discovery. Step 2 is build. The goal of discovery is to document known requirements, some initial design, and a project plan. Step 1 of our 2 step includes at least the following tasks: Gather Requirements, Build GUI Mockup, and Create the Initial Database. The Requirements task becomes the project plan for step 2, Build. Discovery can include additional tasks such as documenting an existing application, data cleanup, and even a task or two from the initial coding phase such as implementing our Prestwood ASP.Net MVC shell which includes some initial design, and member management. If this ticket is not authorized, the printed version of the Project Plan is the Project Proposal for Discovery. Once authorized, the tasks of this project are completed. The requirements task is completed by creating a Step 2 of 2 project ticket which becomes the project plan and/or the proposal for Step 2, Build. Posted to KB Topic: Coding Services Info
2/24/2017, and updated 5/28/2017
|
SS
2397
Hits |
Prestwood IT Solutions |
Mike Prestwood |
3. Prospect, Build App, New
Feasibility Phase, which is part of Discovery, can include converting any existing documentation into our system, or we can just get started by kicking off a Requirements+Design project. Time Estimate: Although it depends on many factors, feasibility usually ranges from 0 to 16 hours, but each client varies. Our recommendation is that we kick-off a Requirements+Design project ASAP. Goals:
Note: For the best chance of a successful project, limit version 1.0 to as few features as reasonable. Posted to KB Topic: Coding Services Info
2/6/2017
|
SS
1860
Hits |
Prestwood IT Solutions |
Mike Prestwood |
4. Document Legacy System
Usually includes screenshots with text, access to physical database for reference, or we document existing database. Other documentation might include creating videos of old app focusing on walking through of various use cases.
Posted to KB Topic: Coding Services
1/29/2013, and updated 2/5/2017
|
KB Post
5807
Hits |
Client Extranet |
Mike Prestwood |
5. Prospect, Build App, Convert from Old
Feasibility Phase, which is part of Discovery, can include documenting existing system, establishing scope of new application (meaning document what is in old app that is not needed, plus minimal needed additional features). Time Estimate: Although it depends on the complexity of the old application, feasibility usually ranges from 16 to 40 hours, but for larger complex applications, they can be several hundred hours. Goals:
Note: For the best chance of a successful project, limit changes to as few as reasonable. Posted to KB Topic: Coding Services Info
2/5/2017
|
SS
2683
Hits |
Prestwood IT Solutions |
| More... |
|